ROUTE 55 over N405-S55 CONNECTOR

12-ORA-055-R6.06-CMS · County 059, California · Built 1966 · 9 Lanes · 167,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
55 0424
Year Built
1966
Reconstructed
1970
Length
39 m (128 ft)
Max Span
18.6 m
Width
38.4 m (126 ft)
Lanes
9
Daily Traffic
167,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,498,000
Total Project Cost
$2,516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.