STATE ROUTE 55 over DYER RD

12-ORA-055-R7.87-SA · County 059, California · Built 1966 · 12 Lanes · 236,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55 0409
Year Built
1966
Reconstructed
2013
Length
68 m (223.1 ft)
Max Span
26.2 m
Width
55.8 m (183.1 ft)
Lanes
12
Daily Traffic
236,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.