STATE ROUTE 55 over NORTH ORANGE UC

12-ORA-055-15.50-ORA · County 059, California · Built 1961 · 14 Lanes · 227,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55 0325
Year Built
1961
Reconstructed
2002
Length
37.2 m (122 ft)
Max Span
12.2 m
Width
69.3 m (227.4 ft)
Lanes
14
Daily Traffic
227,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.