SIXTH STREET over DEER CREEK CHANNEL

0.6 MI E ARCHIBALD AVE · County 071, California · Built 1981 · 5 Lanes · 13,440 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54C0558
Year Built
1981
Reconstructed
2002
Length
13.6 m (44.6 ft)
Max Span
12.8 m
Width
23.5 m (77.1 ft)
Lanes
5
Daily Traffic
13,440
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.