BASE LINE RD EB over UP RR

2.55 MI W RTE I-215 · County 071, California · Built 1967 · 2 Lanes · 9,767 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54C0213R
Year Built
1967
Length
51.8 m (169.9 ft)
Max Span
13.1 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
9,767
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.