ARCHIBALD AVE over LOWER DEER CREEK CHANNEL

1.6 MI S OF ROUTE 60 · County 071, California · Built 1947 · 4 Lanes · 22,691 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
54C0201
Year Built
1947
Reconstructed
1988
Length
13.7 m (44.9 ft)
Max Span
4.2 m
Width
32.3 m (106 ft)
Lanes
4
Daily Traffic
22,691
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.