BARTON RD over SAN TIMOTEO CREEK

0.3 MI W CALIFORNIA ST · County 071, California · Built 1972 · 4 Lanes · 24,760 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
54C0159
Year Built
1972
Length
74.4 m (244.1 ft)
Max Span
32.3 m
Width
28 m (91.9 ft)
Lanes
4
Daily Traffic
24,760
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.