CHERRY AVE over UP RR & AMTRAK

200 S OF I-10 · County 071, California · Built 1959 · 8 Lanes · 33,843 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54C0065
Year Built
1959
Reconstructed
2014
Length
33.8 m (110.9 ft)
Max Span
33.5 m
Width
45.4 m (149 ft)
Lanes
8
Daily Traffic
33,843
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.