WASHINGTON AVENUE over INTERSTATE 215 & RAMPS

08-SBD-215-2.69-COL · County 071, California · Built 2023 · 6 Lanes · 25,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 1355
Year Built
2023
Length
73.1 m (239.8 ft)
Max Span
36.5 m
Width
33.8 m (110.9 ft)
Lanes
6
Daily Traffic
25,000
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.