STATE ROUTE 83 over INTERSTATE 10

08-SBD-083-3.47-UPL · County 071, California · Built 2023 · 9 Lanes · 34,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
54 1348
Year Built
2023
Length
63.1 m (207 ft)
Max Span
34.1 m
Width
51.1 m (167.7 ft)
Lanes
9
Daily Traffic
34,500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.