STATE ROUTE 138 over HOG RANCH CREEK

08-SBD-138-R17.34 · County 071, California · Built 2018 · 2 Lanes · 5,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 1218
Year Built
2018
Length
45 m (147.6 ft)
Max Span
45 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
5,500
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.