MURIEL DRIVE over INTERSTATE 15 & RAMPS

08-SBD-015-74.15-BSW · County 071, California · Built 1998 · 2 Lanes · 10,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 1174
Year Built
1998
Length
86 m (282.2 ft)
Max Span
44.7 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
10,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.