SOQUEL CANYON PKWY over STATE ROUTE 71

08-SBD-071-R4.93-CHNH · County 071, California · Built 1997 · 6 Lanes · 15,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 1132
Year Built
1997
Length
105 m (344.5 ft)
Max Span
53 m
Width
39.7 m (130.2 ft)
Lanes
6
Daily Traffic
15,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.