STATE ROUTE 58 WB over BNSF RY UP RR & AMTRAK

08-SBD-058-R33.41-BSW · County 071, California · Built 1997 · 3 Lanes · 6,750 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
54 1112L
Year Built
1997
Length
94 m (308.4 ft)
Max Span
49 m
Width
17.2 m (56.4 ft)
Lanes
3
Daily Traffic
6,750
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.