S330-E210 CONNECTR over SR-210 PACIFIC AV POC
08-SBD-330-R28.70-SBD · County 071, California · Built 1992 · 1 Lanes · 10,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
34.129722, -117.204486
This bridge is in worse condition than 52.5% of bridges in County 071. The average bridge in California is 0 years old; this one is 34 years old.
Nearby Bridges
S330-E210CONNECTOR over E210-N330 CONNECTOR RAMP
Built 1993
E210-N330 CONNECTR over STATE ROUTE 210
Built 1992
PALM AVENUE over STATE ROUTE 210
Built 1992
ORANGE STREET over STATE ROUTE 210
Built 1992
STATE ROUTE 330 over BOULDER AVENUE
Built 1993
BASELINE ROAD over STATE ROUTE 210
Built 1992
CENTRAL AVENUE over STATE ROUTE 210
Built 1992
HIGHLAND AVENUE over STATE HIGHWAY 330
Built 1993
BASELINE ROAD over CITY CREEK
Built 1985
HIGHLAND AVE over CITY CREEK
Built 1993
Bridge Details
- Structure #
- 54 1098F
- Year Built
- 1992
- Length
- 148.4 m (486.9 ft)
- Max Span
- 52.4 m
- Width
- 11.4 m (37.4 ft)
- Lanes
- 1
- Daily Traffic
- 10,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.