STATE ROUTE 210 WB over ACCESS ROAD

08-SBD-210-R30.61-HIGH · County 071, California · Built 1984 · 3 Lanes · 44,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 1058L
Year Built
1984
Reconstructed
2023
Length
27.7 m (90.9 ft)
Max Span
11.6 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
44,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.