N15-BASELINE OFFRP over EAST AVENUE

08-SBD-015-6.70-RCUC · County 071, California · Built 1976 · 2 Lanes · 14,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0975S
Year Built
1976
Reconstructed
2016
Length
42.4 m (139.1 ft)
Max Span
21 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
14,800
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.