S15-E210 CONNECTOR over I15 I210 & CONNECTOR

08-SBD-015-8.30-RCUC · County 071, California · Built 2001 · 2 Lanes · 4,501 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0967F
Year Built
2001
Length
781.5 m (2564 ft)
Max Span
51.8 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
4,501
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.