STATE ROUTE 210 EB over PIONEER AVENUE

08-SBD-210-R32.08-RDL · County 071, California · Built 1992 · 4 Lanes · 44,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0933R
Year Built
1992
Reconstructed
2023
Length
32.6 m (107 ft)
Max Span
32 m
Width
22 m (72.2 ft)
Lanes
4
Daily Traffic
44,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.