INTERSTATE 15 NB over ARROW ROUTE

08-SBD-015-4.61-RCUC · County 071, California · Built 1975 · 4 Lanes · 98,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
54 0921R
Year Built
1975
Length
47.2 m (154.9 ft)
Max Span
47.2 m
Width
20.7 m (67.9 ft)
Lanes
4
Daily Traffic
98,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.