INTERSTATE 40 over WOODS WASH

08-SBD-040-R104.89 · County 071, California · Built 1970 · 2 Lanes · 7,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
54 0804R
Year Built
1970
Length
72.5 m (237.9 ft)
Max Span
6.7 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
7,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$903,000
Total Project Cost
$1,517,000