INTERSTATE 40 over BLIND HILLS WASH
08-SBD-040-R100.48 · County 071, California · Built 1970 · 2 Lanes · 7,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
34.802175, -115.307683
This bridge is in worse condition than 95.8% of bridges in County 071. The average bridge in California is 0 years old; this one is 56 years old.
Nearby Bridges
INTERSTATE 40 over BLIND HILLS WASH
Built 1970
ESSEX ROAD over INTERSTATE 40
Built 1973
INTERSTATE 40 over HALFWAY HILLS WASH
Built 2024
INTERSTATE 40 over HALFWAY HILLS WASH
Built 2024
INTERSTATE 40 over HALFWAY HILLS WASH
Built 1970
INTERSTATE 40 EB over CLIPPER VALLEY WASH
Built 2016
INTERSTATE 40 WB over CLIPPER VALLEY WASH
Built 2017
INTERSTATE 40 over BLACK CYN WASH
Built 1970
INTERSTATE 40 over BLACK CYN WASH
Built 1970
INTERSTATE 40 WB over ROJO WASH
Built 2017
Bridge Details
- Structure #
- 54 0798R
- Year Built
- 1970
- Length
- 72.2 m (236.9 ft)
- Max Span
- 7.9 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 7,500
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $899,000
- Total Project Cost
- $1,510,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.