INTERSTATE 15 NB over CAJON CREEK / CAJON BLVD

08-SBD-015-16.07 · County 071, California · Built 1969 · 4 Lanes · 69,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0781R
Year Built
1969
Reconstructed
2016
Length
168.6 m (553.1 ft)
Max Span
30.5 m
Width
31 m (101.7 ft)
Lanes
4
Daily Traffic
69,500
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.