STATE ROUTE 259 NB over H STREET

08-SBD-259-1.01-SBD · County 071, California · Built 1968 · 2 Lanes · 38,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
54 0763R
Year Built
1968
Length
53.6 m (175.9 ft)
Max Span
52.4 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
38,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.