INTERSTATE 40 EB over ASH HILL WASH

08-SBD-040-R54.77R · County 071, California · Built 1970 · 2 Lanes · 9,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
54 0758R
Year Built
1970
Length
58.5 m (191.9 ft)
Max Span
21.3 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
9,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.