STATE ROUTE 60 over MOUNTAIN AVENUE

08-SBD-060-R3.60-CHN · County 071, California · Built 1970 · 10 Lanes · 220,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0749
Year Built
1970
Reconstructed
1997
Length
47 m (154.2 ft)
Max Span
26 m
Width
50 m (164 ft)
Lanes
10
Daily Traffic
220,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.