CAPE GLOUCESTER AV over ROUTE 40

08-SBD-040-R2.67 · County 071, California · Built 1964 · 2 Lanes · 1,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0657
Year Built
1964
Length
80.5 m (264.1 ft)
Max Span
29.6 m
Width
14.7 m (48.2 ft)
Lanes
2
Daily Traffic
1,400
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.