INTERSTATE 15 SB over WHEATON WASH

08-SBD-015-173.84L · County 071, California · Built 1963 · 3 Lanes · 18,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
54 0621L
Year Built
1963
Reconstructed
2017
Length
64.9 m (212.9 ft)
Max Span
7.7 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
18,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,167,000
Total Project Cost
$1,960,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.