INTERSTATE 10 over NEVADA STREET

08-SBD-010-28.80-RDL · County 071, California · Built 1962 · 12 Lanes · 116,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0594
Year Built
1962
Reconstructed
1990
Length
42.1 m (138.1 ft)
Max Span
23.2 m
Width
54.3 m (178.1 ft)
Lanes
12
Daily Traffic
116,500
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.