INTERSTATE 215 over UNIVERSITY PARKWAY

08-SBD-215-11.63-SBD · County 071, California · Built 1958 · 4 Lanes · 91,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
54 0514
Year Built
1958
Length
32.3 m (106 ft)
Max Span
31.7 m
Width
35.3 m (115.8 ft)
Lanes
4
Daily Traffic
91,000
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.