INTERSTATE 215 over WARM CREEK OVERFLOW

08-SBD-215-5.09-SBD · County 071, California · Built 1958 · 8 Lanes · 175,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0486M
Year Built
1958
Reconstructed
1972
Length
71.9 m (235.9 ft)
Max Span
15.8 m
Width
35.3 m (115.8 ft)
Lanes
8
Daily Traffic
175,000
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.