INTERSTATE 10 over DAY CANYON CHANNEL

08-SBD-010-10.12-ONT · County 071, California · Built 1943 · 12 Lanes · 226,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0351
Year Built
1943
Reconstructed
2022
Length
26.2 m (86 ft)
Max Span
8.8 m
Width
60.7 m (199.1 ft)
Lanes
12
Daily Traffic
226,300
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.