INTERSTATE 15 NB over DRY LAKE DITCH

08-SBD-015-180.94 · County 071, California · Built 1963 · 3 Lanes · 19,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 0317R
Year Built
1963
Reconstructed
2010
Length
28 m (91.9 ft)
Max Span
6.1 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
19,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.