SIX STREET over LOS ANGELES RIVER

SIXTH STREET OVER LA RIVE · County 037, California · Built 2022 · 4 Lanes · 50,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
53C2329
Year Built
2022
Length
841.4 m (2760.5 ft)
Max Span
95.4 m
Width
30.5 m (100.1 ft)
Lanes
4
Daily Traffic
50,000
Material
Prestressed Concrete Continuous
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.