Baseline Road over Marshall Creek Channel

0.2 M E/O WHEELER AVE · County 037, California · Built 1966 · 4 Lanes · 24,624 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53C2321
Year Built
1966
Reconstructed
1983
Length
8.8 m (28.9 ft)
Max Span
7.9 m
Width
29.4 m (96.5 ft)
Lanes
4
Daily Traffic
24,624
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.