92ND ST over ACTA
50FT E/O ALAMEDA ST · County 037, California · Built 2000 · 5 Lanes · 11,400 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.953147, -118.229956
This bridge is in worse condition than 64.9% of bridges in County 037. The average bridge in California is 0 years old; this one is 26 years old.
Nearby Bridges
FIRESTONE BLVD over ACTA
Built 2000
HON ENTRANCE over ACTA
Built 2000
TWEEDY BLVD over ACTA
Built 2000
ENGLE DRIVEWAY over ACTA
Built 2000
NADEAU ST over ACTA
Built 2000
MRTN LUTHER KNG BL over ACTA
Built 2000
METRO CMMERCIAL DW over ACTA
Built 2000
74TH ST over ACTA
Built 2007
SANTA ANA BLVD over ACTA
Built 2000
FLORENCE AVE over ACTA
Built 2000
Bridge Details
- Structure #
- 53C2133
- Year Built
- 2000
- Length
- 17.9 m (58.7 ft)
- Max Span
- 15.6 m
- Width
- 29.2 m (95.8 ft)
- Lanes
- 5
- Daily Traffic
- 11,400
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.