HENRY FORD AVE over DOMINGUEZ CHANNEL

0.3 MI S/O ANAHEIM ST · County 037, California · Built 2002 · 7 Lanes · 8,333 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53C2106
Year Built
2002
Length
61.2 m (200.8 ft)
Max Span
20.4 m
Width
36.4 m (119.4 ft)
Lanes
7
Daily Traffic
8,333
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.