Seaside Freeway over Pier S Avenue

0.7 MILE EO NAVY WAY · County 037, California · Built 2005 · 4 Lanes · 47,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53C2071
Year Built
2005
Length
44.6 m (146.3 ft)
Max Span
42.9 m
Width
27.9 m (91.5 ft)
Lanes
4
Daily Traffic
47,900
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.