VAN NESS AVE over HOLLYPARK DRN

75FT N/O 135 ST · County 037, California · Built 1999 · 5 Lanes · 16,728 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
53C2069
Year Built
1999
Length
12.8 m (42 ft)
Max Span
4.1 m
Width
27.4 m (89.9 ft)
Lanes
5
Daily Traffic
16,728
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.