COMMERCE CTR DR over CASTAIC CRK / HASLEY CH
0.2MI W/O HENRY MAYO DR · County 037, California · Built 1998 · 6 Lanes · 12,976 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.437722, -118.621189
This bridge is in worse condition than 15.3% of bridges in County 037. The average bridge in California is 0 years old; this one is 28 years old.
Nearby Bridges
STATE ROUTE 126 over COMMERCE CITY DRIVE
Built 2016
STATE ROUTE 126 over CASTAIC CREEK
Built 1989
COMMERCE CENTER DR over HASLEY CYN CRK
Built 1993
STATE ROUTE 126 over THE OLD ROAD
Built 1964
HONOR RANCHO RD over ROUTE 5
Built 1968
STATE ROUTE 126 over INTERSTATE 5
Built 2005
THE OLD RD over CASTAIC CRK
Built 1931
INTERSTATE 5 over CASTAIC CREEK
Built 1968
INTERSTATE 5 SB over CASTAIC CREEK
Built 1968
HASLEY CANYON ROAD over ROUTE 5
Built 2010
Bridge Details
- Structure #
- 53C1985
- Year Built
- 1998
- Length
- 172.2 m (565 ft)
- Max Span
- 26.2 m
- Width
- 29.9 m (98.1 ft)
- Lanes
- 6
- Daily Traffic
- 12,976
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.