WINDSOR WAY over QUEEN MARY PRK LOT EXIT

0.3MI S/O HARBOR PLZ · County 037, California · Built 1969 · 3 Lanes · 14,280 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
53C1592
Year Built
1969
Length
11.7 m (38.4 ft)
Max Span
5.9 m
Width
36.6 m (120.1 ft)
Lanes
3
Daily Traffic
14,280
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.