TUPELO RIDGE DR over DRY CYN CHAN

1.8MI N/O BOUQUET CN RD · County 037, California · Built 1979 · 2 Lanes · 1,437 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53C1586
Year Built
1979
Length
13.1 m (43 ft)
Max Span
12.5 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
1,437
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.