ECHELON AVE over PUENTE CRK

0.1MI S/O AMAR RD · County 037, California · Built 1970 · 2 Lanes · 5,345 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
53C1530
Year Built
1970
Length
9.8 m (32.2 ft)
Max Span
9.1 m
Width
16.3 m (53.5 ft)
Lanes
2
Daily Traffic
5,345
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.