GARIBALDI AVE over EATON WASH
0.4MI W/O ROSEMEAD BLVD · County 037, California · Built 1953 · 2 Lanes · 918 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 8 | Very Good |
Location
34.109342, -118.079581
This bridge is in worse condition than 97.4% of bridges in County 037. The average bridge in California is 0 years old; this one is 73 years old.
Nearby Bridges
HERMOSA DR over EATON WASH
Built 1955
LONGDEN AVE over EATON WASH
Built 1957
ELM AND MUSCATEL over EATON WASH
Built 1933
LAS TUNAS DR over EATON WASH
Built 1927
BROADWAY over EATON WASH
Built 1967
DUARTE RD over EATON WASH
Built 1989
HERMOSA DR over RUBIO WASH
Built 1927
E LAS TUNAS DR over RUBIO WASH
Built 1911
SAN GABRIEL BLVD over RUBIO WASH
Built 1914
PINE ST over RUBIO WASH
Built 1935
Bridge Details
- Structure #
- 53C1416
- Year Built
- 1953
- Length
- 27.1 m (88.9 ft)
- Max Span
- 12.5 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 918
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $388,000
- Total Project Cost
- $651,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.