CANOGA AVE over SANTA SUSANA CREEK

0.2 M N/O PARTHENIA ST · County 037, California · Built 1966 · 5 Lanes · 23,713 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
53C1117
Year Built
1966
Reconstructed
1971
Length
13.7 m (44.9 ft)
Max Span
12.2 m
Width
23.6 m (77.4 ft)
Lanes
5
Daily Traffic
23,713
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.