CHEVY CHASE over HAY CYN CHAN

0.5MI S/O FOOTHILL BLVD · County 037, California · Built 1937 · 2 Lanes · 4,080 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
53C1052
Year Built
1937
Length
10.7 m (35.1 ft)
Max Span
3.7 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
4,080
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.