HOLLY ST over ARROYO BLVD / ARROYO S

0.2MI W/O US-101 FWY · County 037, California · Built 1925 · 2 Lanes · 7,453 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
53C1041
Year Built
1925
Length
121.9 m (399.9 ft)
Max Span
73.1 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
7,453
Material
Concrete
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$3,866,000
Total Project Cost
$6,496,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.