SYCAMORE PL over SIERRA MADRE WASH

0.6MI W/O SANTA ANITA AVE · County 037, California · Built 1928 · 2 Lanes · 408 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53C1038
Year Built
1928
Length
8.2 m (26.9 ft)
Max Span
7.3 m
Width
6.8 m (22.3 ft)
Lanes
2
Daily Traffic
408
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$128,000
Total Project Cost
$215,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.