DON JULIAN RD over PUENTE CRK

0.3MI E/O 7TH AVE · County 037, California · Built 1953 · 4 Lanes · 9,246 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
53C1009
Year Built
1953
Reconstructed
1994
Length
23.8 m (78.1 ft)
Max Span
11.6 m
Width
18.2 m (59.7 ft)
Lanes
4
Daily Traffic
9,246
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.