CIRCLE TRAIL over TOPANGA CYN CRK

25FT W/O TOPANGA CYN BLVD · County 037, California · Built 1936 · 2 Lanes · 204 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
7
Good
Superstructure
5
Fair
Substructure
3
Serious

Bridge Details

Structure #
53C0970
Year Built
1936
Reconstructed
1966
Length
12.5 m (41 ft)
Max Span
11.9 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
204
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$246,000
Total Project Cost
$413,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.